What a 12-Stall DC Fast Charging Site Can Earn Over 10 Years
Twelve stalls, 250 kW each. Year by year, here's the LCFS credit revenue schedule a real site can model against.
Numbers cut through abstraction. Below is the LCFS credit revenue schedule for a representative twelve-stall DC fast charging site in Southern California — 250 kW per stall, 3,000 kW of installed capacity, 400 kWh per day per stall of average utilization, modeled against a stable $0.06 per kWh blended LCFS rate post-fee.
The site
- 12 stalls × 250 kW = 3,000 kW total capacity
- Average utilization: 400 kWh per stall per day
- Blended LCFS rate (assumed, post-fee): $0.060 per kWh
- Eligibility horizon: 10 years
The schedule
Year 1 LCFS revenue lands at roughly $105,000. From there, we model a 15% annual growth rate, reflecting tightening LCFS targets and the corresponding credit-price firmness over the eligibility window.
- Year 1 — $105,120
- Year 2 — $120,888
- Year 3 — $139,021
- Year 4 — $159,874
- Year 5 — $183,855
- Year 6 — $211,433
- Year 7 — $243,148
- Year 8 — $279,620
- Year 9 — $321,563
- Year 10 — $369,797
Ten-year LCFS credit revenue clears $2.13M on this single pad, before stacking FCI capacity credits or any front-loaded incentive (CALeVIP, 30C).
"On a twelve-stall pad, ten years of LCFS credits often exceeds the original installed cost of the chargers."
Sensitivity
Utilization is the variable that matters most. A pad running 250 kWh per stall per day rather than 400 produces meaningfully less Year 1 revenue, but the growth shape of the credit stack is largely unchanged. Conversely, sites running above 500 kWh per stall per day — common on well-located retail Superchargers — exceed the model materially.
Model your own site
Send us your site addresses, charger counts, rated power, and a rough utilization estimate. We'll return a year-by-year LCFS credit revenue schedule built on the same inputs, customized to your equipment and location.
Credit prices fluctuate; actual revenue varies by site, utilization, and market conditions. Figures are illustrative.
See what your sites can earn.
We model your ten-year LCFS and FCI credit stack against your actual sites — no upfront cost, no obligation.
Get my free estimate